AIMS Engineering Pty Ltd shows the problem, what we did and what the client got on four jobs. Match them to your own plant.

Project

Sustaining Capital inspections and design

Client
WSP, principal Rio Tinto Iron Ore
Location
Rio Tinto Iron Ore sites
Environment
operating mine assets
Year
ongoing
Scope
inspection reports, repair plans and structural design, delivered fully in-house
Sustaining Capital inspections and design

Challenge

A big program of structural defects on mine assets, 728 in the end, each needing its own repair plan.

Solution

Our engineers inspected the assets and wrote a repair plan for every defect. They also produced designs, calculations and drawings for the repairs.

Outcome

The client received inspection reports and a repair plan for every defect, with drawings ready for construction.

Project

Tractor shed assessment and design changes

Client
WSP, principal Rio Tinto Iron Ore
Location
Tom Price
Environment
operating heavy industrial shed with gantry cranes
Year
2025
Scope
inspection, analysis and repair design, delivered fully in-house
Tractor shed assessment and design changes

Challenge

The shed bent more than it should, lacked bracing along its length and had crane columns that weren't strong enough.

Solution

We inspected the shed and analysed it in SpaceGass software. We designed extra bracing, tie beams and stronger crane columns, then updated the drawings.

Outcome

WSP and Rio Tinto received an assessment report, the design changes and updated drawings, with the shed's daily use allowed for.

Project

Rooftop solar program structural assessment

Client
WSP, principal Rio Tinto Iron Ore
Location
Gudai-Darri, Greater Brockman, Greater Nammuldi and Boolgeeda Airport
Environment
15 non-process buildings, including transportable buildings, sheds, warehouses and dining halls
Year
2025
Scope
two site visits, desktop analysis and a structural report, delivered fully in-house
Rooftop solar program structural assessment

Challenge

Fifteen buildings of different types at remote sites each needed an answer on whether the roof could carry solar panels.

Solution

Our engineers inspected the buildings and modelled typical ones in SpaceGass. They checked the weight and wind loads on each roof, then reported on every building.

Outcome

The client received findings for every building and a clear answer on solar suitability, with weak buildings identified.

Project

Argyle closure drone mapping

Client
Rio Tinto, directly
Location
Argyle diamond mine
Environment
mine closure civil works
Status
recently completed
Scope
four months of drone photo collection and 2D and 3D models in Bentley iTwin
Argyle closure drone mapping

Challenge

Civil works on the Argyle mine closure needed regular photo records and 3D models to report progress over four months.

Solution

We flew drones over the Argyle site when asked, then turned the photos into 2D and 3D models in Bentley iTwin.

Outcome

Rio Tinto received 3D models and photo records to report progress on the closure civil works.

Contact us about your project

Send us your scope and site details

info@aimsengineering.com.au

Scope or drawings, site address and access, timeframe and site entry requirements

(08) 6113 7848 or 0449 872 030, info@aimsengineering.com.au

Contact us about your project