AIMS Engineering Pty Ltd shows the problem, what we did and what the client got on four jobs. Match them to your own plant.
Project
Sustaining Capital inspections and design
- Client
- WSP, principal Rio Tinto Iron Ore
- Location
- Rio Tinto Iron Ore sites
- Environment
- operating mine assets
- Year
- ongoing
- Scope
- inspection reports, repair plans and structural design, delivered fully in-house

Challenge
A big program of structural defects on mine assets, 728 in the end, each needing its own repair plan.
Solution
Our engineers inspected the assets and wrote a repair plan for every defect. They also produced designs, calculations and drawings for the repairs.
Outcome
The client received inspection reports and a repair plan for every defect, with drawings ready for construction.
Project
Tractor shed assessment and design changes
- Client
- WSP, principal Rio Tinto Iron Ore
- Location
- Tom Price
- Environment
- operating heavy industrial shed with gantry cranes
- Year
- 2025
- Scope
- inspection, analysis and repair design, delivered fully in-house

Challenge
The shed bent more than it should, lacked bracing along its length and had crane columns that weren't strong enough.
Solution
We inspected the shed and analysed it in SpaceGass software. We designed extra bracing, tie beams and stronger crane columns, then updated the drawings.
Outcome
WSP and Rio Tinto received an assessment report, the design changes and updated drawings, with the shed's daily use allowed for.
Project
Rooftop solar program structural assessment
- Client
- WSP, principal Rio Tinto Iron Ore
- Location
- Gudai-Darri, Greater Brockman, Greater Nammuldi and Boolgeeda Airport
- Environment
- 15 non-process buildings, including transportable buildings, sheds, warehouses and dining halls
- Year
- 2025
- Scope
- two site visits, desktop analysis and a structural report, delivered fully in-house

Challenge
Fifteen buildings of different types at remote sites each needed an answer on whether the roof could carry solar panels.
Solution
Our engineers inspected the buildings and modelled typical ones in SpaceGass. They checked the weight and wind loads on each roof, then reported on every building.
Outcome
The client received findings for every building and a clear answer on solar suitability, with weak buildings identified.
Project
Argyle closure drone mapping
- Client
- Rio Tinto, directly
- Location
- Argyle diamond mine
- Environment
- mine closure civil works
- Status
- recently completed
- Scope
- four months of drone photo collection and 2D and 3D models in Bentley iTwin

Challenge
Civil works on the Argyle mine closure needed regular photo records and 3D models to report progress over four months.
Solution
We flew drones over the Argyle site when asked, then turned the photos into 2D and 3D models in Bentley iTwin.
Outcome
Rio Tinto received 3D models and photo records to report progress on the closure civil works.
Contact us about your project
Send us your scope and site details
info@aimsengineering.com.auScope or drawings, site address and access, timeframe and site entry requirements
(08) 6113 7848 or 0449 872 030, info@aimsengineering.com.au
Contact us about your project